MM102225V1, Rev. B
21
Figure 3-4: Bolt Assembly Used to Bolt Rack to Concrete Floor
•
For
wood floors
, use a lag bolt with an insulating nylon washer under the head to
bolt the racks to the floor. Insulating phenolic strips under the racks are
not
required.
No
pilot hole is needed on wood floors.
•
For
raised floors
, the rack attachment procedure is quite different. The first and
last racks in the row are bolted to the sub-floor as shown below. The remaining
racks are bolted to the end racks, to each other, or both. Insulating phenolic strips
must
be placed under each rack (see Figure 3-5: Raised Floor Rack
Attachment).
Concrete Subfloor
Concrete Anchor
Rack Cutaway
Nylon Washers
Figure 3-5: Raised Floor Rack Attachment
BOLT
ASSEMBLIES
Summary of Contents for P5100 Series
Page 2: ...Installation Manual MM102225V1 Rev B Jul 05 Base Station Tower Site ...
Page 70: ...MM102225V1 Rev B 69 This page intentionally left blank ...
Page 72: ...MM102225V1 Rev B 71 This page intentionally left blank ...
Page 74: ...MM102225V1 Rev B 73 This page intentionally left blank ...
Page 76: ...MM102225V1 Rev B 75 This page intentionally left blank ...
Page 82: ...MM102225V1 Rev B 81 PARAMETER VALUE EXPLANATION password cisco login end buck40sas ...
Page 92: ...MM102225V1 Rev B 91 This page intentionally left blank ...
Page 94: ...MM102225V1 Rev B 93 This page intentionally left blank ...
Page 96: ...MM102225V1 Rev B 95 This page intentionally left blank ...
Page 99: ...MM102225V1 Rev B 98 This page intentionally left blank ...