MM102225V1, Rev. B
29
Figure 3-18: DC Return Distribution Bar - Black Wires
2.
If not already labeled, label OpenSky circuits in the breaker panel to identify each
rack (see Figure 3-19: Properly Labeled OpenSky Circuit Breakers in the
Distribution Panel - OpenSky Rack 1, OpenSky Rack 2, etc.)
Figure 3-19: Properly Labeled OpenSky Circuit Breakers in the Distribution Panel
3.
Route cables as specified by the installation procedure, using existing cable trays and
overhead ladders, routing cables under raised floors, and so on.
4.
Route DC power cables together and maintain at least two inches (2") spacing
between the DC power cable bundle and other types of cables.
Summary of Contents for P5100 Series
Page 2: ...Installation Manual MM102225V1 Rev B Jul 05 Base Station Tower Site ...
Page 70: ...MM102225V1 Rev B 69 This page intentionally left blank ...
Page 72: ...MM102225V1 Rev B 71 This page intentionally left blank ...
Page 74: ...MM102225V1 Rev B 73 This page intentionally left blank ...
Page 76: ...MM102225V1 Rev B 75 This page intentionally left blank ...
Page 82: ...MM102225V1 Rev B 81 PARAMETER VALUE EXPLANATION password cisco login end buck40sas ...
Page 92: ...MM102225V1 Rev B 91 This page intentionally left blank ...
Page 94: ...MM102225V1 Rev B 93 This page intentionally left blank ...
Page 96: ...MM102225V1 Rev B 95 This page intentionally left blank ...
Page 99: ...MM102225V1 Rev B 98 This page intentionally left blank ...