Appendix IV
____________________________________________________________________________________________
59 | Installation, Operation & Maintenance Instructions EASYCHLORGEN
1. Unpacking
PLEASE USE THE ACCOMPANYING PACKING DOCUMENTS TO CHECK THAT
ALL ITEMS ARE PRESENT AND CORRECT.
The main parts of the system include
:
Valve
Upper screen
Brine line
Riser
2. Installation
Please observe the local regulations concerning the installation of your system. Check that
you have allowed space for access to the unit for possible future maintenance. This
installation may require plumbing work and will require an electrical outlet to be fitted near
the system. Only attempt this if you have the necessary skills.
2.1 Pre-installation checks
The area needs to be level, frost free, have access to electricity and an open drain. Check
the incoming water quality is within any parameters specified for that media (contact your
supplier). In addition to this check the incoming water pressure is between 4 and 8 bar and
the water temperature is between 3ºC and 45ºC.
Lower screen
Salt
Brine tank assembly