Chapter 12: Maintenance
_________________________________________________________________________________________
47 | Installation, Operation & Maintenance Instructions EASYCHLORGEN
12.3 Finishing maintenance
Perform the following working steps:-
1.
Make a note of the date and scope of the maintenance
performed.
2.
Complete any operational, service or commissioning log
sheets associated with the EASYCHLORGEN system and
as per any associated documents which are contained
within this manual.
3.
Affix a sticker displaying the maintenance date next to the
EASYCHLORGEN rating plate.
4.
To assure correct start up procedures refer to section 9
“Start-up”.
Maintenance completed.