Ring Setup and Testing: Integration Procedures
Manual Switching Tests
...........................................................................................................................................................................................................................................................
8 - 1 7
365-372-334 R2.0
Issue 4, November 2004
...........................................................................................................................................................................
Step 14
Click on the
opr-protnsw-rr
command.
...........................................................................................................................................................................
Step 15
If the active ring is Ring 2, change the
m{1}
parameter listed under the
<rrAIDPROTN>
column to
m{2}
by double clicking on
1
between the
brackets
{ }
and selecting
2
from the drop down window. Double click
on the
{ LOCKOUT}
under
<PROTNSWSC>
and select
MAN.
Important!
"rr" in <rrAIDPROTN> refers to the cross connect
rate.
...........................................................................................................................................................................
Step 16
Use the scroll bar in the
Command Builder
window to scroll down to
the
rls-protnsw-rr
command.
...........................................................................................................................................................................
Step 17
Click on the
rls-protnsw-rr
command. Under
<rrAIDPROTN>
select
the AID pertaining to the ring that has the manual switch request.
...........................................................................................................................................................................
Step 18
Use the
rtrv-state-path
command to verify desired switch state.
Important!
The active path should now be back to the original
path prior to performing the two manual switches.
...........................................................................................................................................................................
Step 19
Click
Send
to issue the command.
...........................................................................................................................................................................
Step 20
Repeat Step 5 page 15 through Step 19 page 17 for every circuit.
...........................................................................................................................................................................
Step 21
Delete any VT1.5 cross connects with the
dlt-crs-vt1:lt-dmxplore:a-1-
all,m-1-1-all:1::2WAYPR;
command. Delete STS1 cross-connects with the
dlt-crs-sts1:lt-dmxplore:b-all,m-1-all:1::2WAYPR;
...........................................................................................................................................................................
Step 22
Click
Send
to issue the command.
Result:
All VT1.5 and STS1 cross-connections to the shelf will be
deleted followed with a COMPLD message.
Summary of Contents for Metropolis DMXplore
Page 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Page 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Page 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Page 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Page 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...