Installation Tests
Local Equipment and Cross-connect Tests
6 - 1 4
365-372-334 R2.0
Issue 4, November 2004
•
Verify that the pack is provisioned for the framing format being
sent from the test set, CBIT or M13. (rtrv-t3)
•
Check the DS3 cabling for proper connections.
...........................................................................................................................................................................
Step 5
Once the test is complete, remove the loopback. Use the scroll bar in
the Command Builder window to scroll down to the rls-lpbk-t3
command.
Result:
A command similar to rls-lpbk-t3:lt-dmxplore:b-
1:ctag::,,,facility;
...........................................................................................................................................................................
Step 6
Click the Send button.
Result:
The Response Window should display the command
followed by a COMPLD message. A facility loopback will no
longer exist on the port issued by the command.
...........................................................................................................................................................................
Step 7
Remove the test set connections from the associated port on the access
panel.
...........................................................................................................................................................................
Step 8
Verify that an alarm is present on the port that the test set connections
have been removed from. Use the rtrv-alm-all command in the
Command Builder window.
...........................................................................................................................................................................
Step 9
Repeat entire procedure on each of the remaining DS3 tributaries of
function group B.
...........................................................................................................................................................................
Step 10
Use the scroll bar in the
Command Builder
window to scroll down to
the
upd-sys
command.
...........................................................................................................................................................................
Step 11
Click on the
upd-sys
command.
...........................................................................................................................................................................
Step 12
Click
Send
to issue the command.
Summary of Contents for Metropolis DMXplore
Page 8: ... C O N T E N T S v i i i 365 372 334 R2 0 Issue 4 November 2004 ...
Page 16: ... T A B L E S x v i 365 372 334 R2 0 Issue 4 Novmeber 2004 Glossary ...
Page 286: ... Backplane Pin Replacement Replacement Methods D 1 0 365 372 334 R2 0 Issue 4 November 2004 ...
Page 292: ... Installation Checklist Overview E 6 365 372 334 R2 0 Issue 4 November 2004 ...
Page 326: ... G L O S S A R Y G L 3 0 365 372 334 R2 0 Issue 4 November 2004 ...