Chapter 10 Program Example
10-29
Once N Configurator is executed, a new project window becomes active as follows:
[Figure 10.3.2] Initial Execution Screen: New Project Window
For network configuration, the master module (XGL-PMEB) should be composed first. Select
XGL-PMEB from the device list window on the left and drag and drop on the topology in the
project window as seen in the figure below.
[Figure 10.3.3] Insert Master module
Summary of Contents for 47200001
Page 15: ...Table of Content 14 ...
Page 51: ...Chapter 5 Communication Program 5 16 ...
Page 55: ...Chapter 6 SyCon Setting 6 4 Select Yes 5 Configuration Setup Select Next ...
Page 57: ...Chapter 6 SyCon Setting 6 6 3 Setup complete 6 Installed contents 1 Installed file ...
Page 73: ...Chapter 6 SyCon Setting 6 22 ...
Page 99: ...Chapter 7 N Configurator Setting 7 26 ...
Page 115: ...Chapter 8 High speed Link 8 16 ...
Page 127: ...Chapter 9 P2P 9 12 ...
Page 154: ...Chapter 10 Program Example 10 27 Figure 10 2 24 Link Enable High speed link P2P ...
Page 173: ...Chapter 10 Program Example 10 46 ...
Page 183: ...Chapter 11 Troubleshooting 11 10 11 4 3 XG5000 abnormal connection ...
Page 185: ...Chapter 11 Troubleshooting 11 12 ...
Page 197: ...Appendix A 8 A 3 Dimensions XGL PMEA B C have same dimensions Unit mm ...
Page 199: ...Warranty and Environment Policy 2 ...