Chapter 10 Program Example
10-11
Select the Pnet for module type, position of current master communication module is set the base number
and slot number. Communication cycle is set free from 20ms to 10s (Basic 20ms), It will be a data
transmission cycle between CPU module of PLC and Master communication module. In emergency, output
setting is set suitable to user
’s environment. Click ‘OK’ and then ‘Block’ is created below ‘High-speed link 1’,
Double click it.
After block is created, click the index of block information frame (right frame). Click [Online]-
[Communication module setting]-[Config. Upload (Dnet, Pnet)] and it brought the setting information in
SyCon.
[Figure 10.1.22] Config. Upload (Dnet, Pnet)
After SyCon setting file is uploaded, setting information is displayed in block window as shown below.
Double click the applicable index to set the address. Set %MW200 for station3, %MW0 for station 4
and %MW3000 for area to read, %MW3011 for area to save of station 6.
Summary of Contents for 47200001
Page 15: ...Table of Content 14 ...
Page 51: ...Chapter 5 Communication Program 5 16 ...
Page 55: ...Chapter 6 SyCon Setting 6 4 Select Yes 5 Configuration Setup Select Next ...
Page 57: ...Chapter 6 SyCon Setting 6 6 3 Setup complete 6 Installed contents 1 Installed file ...
Page 73: ...Chapter 6 SyCon Setting 6 22 ...
Page 99: ...Chapter 7 N Configurator Setting 7 26 ...
Page 115: ...Chapter 8 High speed Link 8 16 ...
Page 127: ...Chapter 9 P2P 9 12 ...
Page 154: ...Chapter 10 Program Example 10 27 Figure 10 2 24 Link Enable High speed link P2P ...
Page 173: ...Chapter 10 Program Example 10 46 ...
Page 183: ...Chapter 11 Troubleshooting 11 10 11 4 3 XG5000 abnormal connection ...
Page 185: ...Chapter 11 Troubleshooting 11 12 ...
Page 197: ...Appendix A 8 A 3 Dimensions XGL PMEA B C have same dimensions Unit mm ...
Page 199: ...Warranty and Environment Policy 2 ...