5
Now assemble both bottom side rails
below the already assembled vertical
posts by sliding them over the wooden
pegs. Tighten these joints (A-A and B-
B) with an m8 x 130 mm bolt, large
washer, and barrel nut.
Slide the front posts over the wooden
pegs of the upper and lower side rails
and make the connections I-I, J-J, F-F,
and E-E with the four remaining m8 x
130 mm bolts, large washers, and
barrel nuts.
3. Mounting the foot rail and cross member
Take the foot rail GH out of Box D and
slide it with its wooden pegs into the
holes from one of the front posts.
Watch out for the proper position of the
foot rail; the holes for the barrel nuts
have to face the loom. Let the wooden
pegs of the other side of the foot rail
rest on the lower side rail.
Summary of Contents for Megado 110
Page 2: ......