Note
: Use These Instructions for
ULC Installations
Materials List
Materials included in package
LNI 2000
Power Pak
Two (2) CAT 5 cables
Grommet
20K re 2” heat shrink tube to protect resistor from accidental
shorts
Installation Poster
Documentation Card listing web address of all required documentation
Not included
Two (2) metal screws for mounting the LNI 2000.
Minimum length: 1.25 inches. Recommended length: 1.5 inches
Additional patch or alarm cabling.
Tools required for installation
Small slotted screwdriver for terminal strip
Phillips # 1 and # 2 screwdriver
Tie wraps (cable ties)
LNI 2000 Installation Manual
12