Note: If you experience any issues with the lights not working and suspect an issue with a component, please try a different port on the
expansion board to verify where the fault lies (with the light or expansion board). To correct any issues with expansion board ports,
please view the section addressing expansion board issues on our
online troubleshooting guide.
43.)
Using your LEGO Removal tool, create a gap underneath the white plate above the second floor (recording studio).
Take a new
White Strip Light
and connect the other end of the 15cm Connecting cable from the first strip light to it’s right port. Take a new
15cm
Connecting Cable
and connect it to the strip light’s left port
Tuck the cable in between the ground and second floor through the right side in between the second and third stud. Run the cable up the corner of the
walls before pushing down the white plate on the right side to close up the gap. Secure the connecting cable to the corner of the wall using tape.