74
ENGLISH
USING THE PROGRAM
Demand Control
After observing changes in power consumption, this feature can prevent power consumption from
exceeding a set limit. If you set the demand control and the program predicts that power consumption
will exceed that limit, it will begin deactivating less important devices to save energy.
NOTES
y
For demand, depending on the installation site specifications, either the peak control or
demand control functions can be selected. Go To
Environment
>
Advance Setting
>
Peak/
Demand Settings
and select a desired control type.
y
For outdoor capacity control, depending on the installation site specifications, either the peak
control or demand control functions can be selected.
y
In the Demand Control menu, you can only check the Demand Control status. You cannot
configure the operation
,
operation switchover cycle
,
desired rate
,
current rate
, etc.
NOTES
y
ACS IV Controller can be used with the LG demand controllers (PCP-D11A2J), but not with the
demand controllers from other manufacturers.
y
LG demand controller is not available in the US Market at this time.
Summary of Contents for ACP IV ACP
Page 2: ......
Page 8: ...vi ENGLISH MEMO ...
Page 20: ...12 ENGLISH MEMO ...
Page 181: ...ver 1 0 0 ...