Troubleshooting Guide
102 Universal System Air Conditioner
• Confirm that the vertical louver is normally geared with the shaft of Stepping Motor.
• If the regular torque is detected when rotating the vertical louver with hands
⇒
Normal
• Check the connecting condition of CN-U/D or CN0L/R Connector
• Check the soldering condition(on PCB) of CN-U/D or CN0L/R Connector
Check the operating circuit of the vertical louver
• Confirm that there is DC +12V between pin
➀
of CN-U/D, CN0L/R and GND.
• Confirm that there is a soldering short at following terminals.
- Between
1
,
2
,
3
and
4
of MICOM
- Between
17
,
18
,
19
and
20
of MICOM
- Between
4
,
5
,
6
and
7
of IC01M
- Between
5
,
6
,
7
and
8
of IC01M
When the louver does not operate.
Trouble 5
If there are no problems after above checks.
• Confirm the assembly condition that are catching and interfering parts in the link of the
vertical louver
Summary of Contents for ABNH186HLAB
Page 66: ...66 Universal System Air Conditioner II Outdoor Units Introduction 67 AUUW B AUUW 0 R410A 69 ...
Page 121: ...Electronic Control Device Service Manual 121 Ceiling Duct Type BH Series ...
Page 122: ...Electronic Control Device 122 Universal System Air Conditioner BG BR Series ...
Page 123: ...Electronic Control Device Service Manual 123 VE Series Ceiling Floor ...
Page 124: ...Electronic Control Device 124 Universal System Air Conditioner VB Series ...
Page 126: ...Schematic Diagram 126 Universal System Air Conditioner Ceiling Cassette Type ...
Page 127: ...Schematic Diagram Service Manual 127 Ceiling Duct Type ...
Page 128: ...Schematic Diagram 128 Universal System Air Conditioner Ceiling Floor ...
Page 183: ...P No 3828A22009B Printed in Korea ...