Diagnosis
Leuze electronic
MSI 100/200
90
11.1.1
MSI 100 and
MSI 200
Table 11-1
Diagnostic indicators for MSI 100 and MSI 200
PWR
(green)
DATA
(green)
ERR
(red)
CONF
(green)
I0 … I19
O0 … O3
Meaning
Device is switched off
No voltage supply at A1 and A2
Initialization phase after switching on or after restart-
ing after the "Confirm" button has been pressed
(maximum duration: 4 s)
Initial commissioning state
No configuration data present on the AC-MSI-CFG1
•
Download project with MSIsafesoft
AC-MSI-CFG1 not present
•
Insert AC-MSI-CFG1 and apply voltage supply
≈
2 Hz
Acknowledgment of new configuration required after
download
•
Press the "Confirm" button on the device
≈
6 Hz
Acknowledgment of a new configuration required
after transfer via AC-MSI-CFG1
For sequence, see chapter 10.3 on page 84
≈
2 Hz
Acknowledgment required after changing an exten-
sion device
•
Press the "Confirm" button on the device
MSI 100:
Normal operation
Configuration data present on the AC-MSI-CFG1
MSI 200:
Normal operation without connected exten-
sion devices (TBUS communication)
Configuration data present on the
AC-MSI-CFG1
MSI 200:
Normal operation with connected exten-
sion units (TBUS communication)
S
M
Limited operation with error on at least one input/out-
put
•
Rectify the error
•
Deactivate input/output
•
Press the "Confirm" button on the device
(duration: min. 15 s)
≈
6 Hz
Error has occurred
•
Read out error code with MSIsafesoft