
Firmware 03.00 - DMS EN 5.0 - 07/2009
L
35
8400 BaseLine D | Software Manual
Commissioning
Commissioning of the drive application with the »Engineer«
3.4.3
Load the Lenze setting
In order to be able to take a defined state as a basis for this commissioning, you have to
load the Lenze setting.
Start the action with
= 1.
Tip!
How to load the Lenze setting using the »Engineer« is described in chapter
3.4.4
Make motor settings
Enter the data of your motor into the field marked with the arrow if it is not a power-
adapted standard motor:
Note!
After the Lenze setting has been loaded, the "action ready" status is reported
= 0.