Commissioning
Commissioning steps (overview)
56
EDBCSXE040 EN 6.0
6.1
Commissioning steps (overview)
Start
Make basic
settings
(
Operation via system bus (CAN) with
higher−level master
(
Control via digital inputs
(
Configure system bus (CAN)
Digital inputs
Set X6/DI1, DI2 = HIGH
Digital inputs
Set X6/DI1, DI2 = HIGH
Specify control word
Specify control word
Configure monitoring
functions
(
l
Save parameters in the power supply
module with C0003 = 1.
l
Save parameter set with GDC in the
parameter set file.
Switch on the mains
End