Operation
55
To ensure that the weight of the rollers al-
so supports the entry behaviour of the im-
plement,
insert the upper pins (3) immediately
above the carrier (4).
This increases the clearance between
the rollers and the ground when the im-
plement is raised.
Secure the pins by inserting the linch
pins.
In this case, the uniwheel is not used. It is raised when the imple-
ment is raised.
4
3