Attaching the implement
45
The position of the top link (1) can be ad-
justed as follows:
Lower the implement completely.
Switch the tractor's three-point linkage to
position control.
Activate the tractor's three-point linkage
until there is no load on the top link pin.
Release the top link pin and pull it out.
Adjust the length of the top link so that
the top link pin can be fitted in the posi-
tion required.
Insert the top link pin.
Secure the top link pin using a linch pin.
The headstock (2) can also be mounted in
a different position, inclined slightly for-
wards, so that the roller can be lifted even
higher with a short top link (1).
Remove the top link (1).
Remove the bolt (4).
Swing the headstock (2) forwards or
backwards until the hole in the strut lines
up with the relevant hole in the head-
stock (2).
Fit the bolt (4).
Tighten the bolt (4) to 1,314 Nm.
Replace the top link (1).
1
2
4
1