![Leica Geosystems ScanStation C10 User Manual Download Page 44](http://html.mh-extra.com/html/leica-geosystems/scanstation-c10/scanstation-c10_user-manual_1873552044.webp)
44
ScanStation C10/C5, Setting Up the Instrument
1. Extend the tripod legs to allow for a comfortable working posture. Tighten the
screws at the bottom of the legs.
2. Place the tribrach on the tripod and secure it with the central fixing screw.
3. Set up the tripod so that the tripod plate is as horizontal as possible.
4. Push the tripod legs firmly into the ground.
5. Place the instrument on the tribrach and secure it with the tribrach’s locking
knob.
6. Level up the instrument using the instrument’s circular level. Turn two of the foot
screws together in opposite directions. The index finger of your right hand indi-
cates the direction in which the bubble should move. Now use the third foot
screw to centre the bubble.
The instrument must be levelled before it is switched
ON
. If not levelled
using the tribrach’s or the instrument’s circular level, it may not power up
properly or scanning accuracy may not be achieved.
Summary of Contents for ScanStation C10
Page 1: ...Leica ScanStation C10 C5 User Manual Version 5 0 English ...
Page 41: ...ScanStation C10 C5 Description of the System 41 ...
Page 85: ...ScanStation C10 C5 Troubleshooting 85 ...
Page 97: ...ScanStation C10 C5 Care and Transport 97 ...
Page 118: ...118 ScanStation C10 C5 Safety Directions a Laser beam b Exit for laser beam b C10_032 a ...
Page 126: ...126 ScanStation C10 C5 Safety Directions Labelling GEB271 ...
Page 127: ...ScanStation C10 C5 Safety Directions 127 Labelling GKL271 ...
Page 149: ...ScanStation C10 C5 Microsoft End User License Agreement EULA 149 ...
Page 152: ......