67
as followings:
Nothing: No action
Power Down: shutdown the power of the PoE port
Power On: keep the power on with the PoE port
Restart Forever: Restart the power of the PoE port always.
Restart Once: only restart the PoE power one time.
Reboot time
To set the reboot time of PD in order for the switch to check PD connection after
PD is completely boot up.
6.7.8 Scheduling(Mode B)
The Poe scheduling is to feed or shut down PoE power over a routine schedule in the
following table. Enable the square of time will power on the PD at dedicated time.
Summary of Contents for IES-3208C
Page 16: ...9...
Page 31: ...24 Multiple Rings...
Page 32: ...25 Dual Homing Chain...
Page 33: ...26...
Page 58: ...51 C You can set the forwarding method of port break event in here...
Page 77: ...70 Demo Demo display each topology in different connection...
Page 103: ...96 6 15 2 3 Remember to press Apply 6 15 1 4 Save setting...
Page 110: ...103...
Page 115: ...108 The setting of none switch 6 18 Dual Homing...
Page 122: ...115...
Page 141: ...134...