41
check boxes of power 1/power 2 ticked, the FAULT LED indicator will then be
possible to light up when any one of the power failures occurs. As for the Port Link
Down/Broken detection, the FAULT LED indicator will light up when the port failure
occurs; certainly the check box beside the port must be ticked first. Please refer to
the segment of
‘
Wiring the Fault Alarm Contact
’ for the failure detection.
Power Failure :
Tick the check box to enable the function of lighting up the
FAULT
LED on the panel when power fails.
Port Link Down/Broken :
Tick the check box to enable the function of lighting
up
FAULT
LED on the panel when Ports
’ states are link down or broken.
Summary of Contents for IES-3208C
Page 16: ...9...
Page 31: ...24 Multiple Rings...
Page 32: ...25 Dual Homing Chain...
Page 33: ...26...
Page 58: ...51 C You can set the forwarding method of port break event in here...
Page 77: ...70 Demo Demo display each topology in different connection...
Page 103: ...96 6 15 2 3 Remember to press Apply 6 15 1 4 Save setting...
Page 110: ...103...
Page 115: ...108 The setting of none switch 6 18 Dual Homing...
Page 122: ...115...
Page 141: ...134...