4)
PRELIMINARY CHECKS
Before assembling the automation, make sure the following requirements have been met:
•
The operator support structure must be solid and must not show any significant deformations.
•
The leaf structure must be rigid and robust.
•
The leaf pivots must be suitable and in a good condition.
•
The lenght and weight of the leaf must lie within the operating limits of the operator (maximum recommended height 3 mt).
•
The leaf must move in a regular manner without friction along its entire stroke.
•
The door requires mechanical end stops consisting of a mechanical retainer in the opening position and a final stopper when
closed.
The mechanical stop in the open position is not supplied with the operator.
If the wall to which the operator will be fastened is not suitably resistant and reliable, a predrilled metal plate is available, upon request,
to which the Neptis SMP can be fixed.
7
1
3
3
3
2
2
2
4
4
4
Base Operator NEPTIS SMP
Elenco Parti / Part List
Descrizione/Description
Qtà/Qty
Parte/Item
Piastra / Plate
1
1
Vite / Screw M6 x 16
3
2
Rondella / Washer
3
3
Vite / Screw M6 x 20
3
4