6.3) SLIDING GUIDE FOR PULL ARM
a) Fix the sliding guide (1) on the leaf through the holes (6-7),
following the dimensions indicated in the technical drawings in
paragraphs 5.1, 5.2.
b) Insert the runner (3) for the pull arm tapered pin inside the sliding
guide.
c) Insert the striker (5) inside the sliding guide and fix it in the end
of stroke opening position using the dowel.
d) Position the cover casing (2) on the sliding guide (1).
e) Insert the two side panels (4) on the ends of the sliding guide.
6.4) BSS2 ARTICULATED PUSH ARM
a) Insert the M8 x 70 screw (2) in the tapered pin (1)
b) Insert the lever arm (3) in the closed shell (4)
c) Insert the tapered pin (1) above the lever arm (3) through the
closed shell (4)
d) Strongly tighten the M6 x 30 screws (5) to block the lever arm (3)
on the tapered pin (1)
e) Fix the arm plate (9) on the leaf or on the lintel using two
screws according to the dimensions indicated in the technical
drawings in paragraphs 5.3 or 5.4
f) Adjust the length of the telescopic arm (7-8) and tighten the
screws (6)
13