ELECTRICAL CONNECTION
TO COMPLETELY MATE
BASE FRAME
FILTER
BASE FRAME
LOCATORS
FILTER
LOCATOR
HOLES
NEUTRODINE FILTER
FIRST COLUMN
TO THE RIGHT
BASE FRAME
PRE-FILTER
Step 8
With the pre-filter in place you are ready to
install the first Neutrodine filter.
1. Start with the column closest to
the command module on the
right corner post shown in
Figure 4-4.
2. Place the rear bottom rails of
the filter on the track of the base
frame (Figure 4-5) and slide
back until you hear a click.
3. Once the filter is in place,
lower the front end on to
the base frame
completely and ensure
the male and female
connection are in fact
mated together (Figure
4-6). Use the two
locators shown to help
line up the filter on the
base frame.
Step 9
Make sure the filters are properly seated on all sides of the base frame. When you are
done placing, use a piece of tape and marker to label the filter’s position. If the filter is
placed first down (directly on top of the base frame) and in the first column (the one
closest to the command module) the
tape label will say “1P” for 1
st
column and primary
filter. If the filter is first placed in the 3rd column away from the command module, the
label will say “3P”. The filter in Figure 4-6 is in a primary filter position.
FILTER RAILS
BASE FRAME
TRACK
POSITION WHERE
CLICK WILL BE HEARD
Figure 4-6
Figure 4-5
Figure 4-4
Summary of Contents for Protector Echo
Page 78: ...78 Fans and Lights not working...
Page 79: ...79 Vertical sash no longer operates smoothly...
Page 80: ...80 Electrical duplex outlets no longer have power Fan operates but lights dim or not working...
Page 81: ...81 Contaminates outside the filtered hood...
Page 82: ...82 Lights operate but fans will not...
Page 83: ...83 Smart Command Alarms...
Page 84: ...84 If needed contact Labconco to troubleshoot further...