This document is the exclusive property of FTFM La Toulousaine and must on no account be copied. It may be modified at any time in accordance with product changes.
_N°7386
Installation_Totem operator (Sliding gate)
09/21
p.5
F
ill
c
om
pl
ete
ly
Iron + Concrete framework
O
veral
l h
ei
gh
t*
400 mm
400 mm
* Overall width and
height correspond to
the order dimensions.
F
ill
c
om
pl
ete
ly
Once the installation is complete, cut the attachment clips according to the height of the posts,
then click them onto the posts.
Please note :
Before installing the gate,
check that the concrete/post
is completely set
(21 days to dry on average).
Do not attach
the caps
It is essential to check
the plumb line of the posts
on all sides.
The 2 posts must be
at the same level
and correctly aligned.
Hei
ght
Hei
ght
Width
Width
Check under hat :
Width between posts and height of posts
Checking worksite dimensions