28
T8
Cancels
the hold operation
Starts
digital ZERO
operation
Cancels
digital ZERO
operation
OFF
ON
OFF
ON
OFF
ON
Starts
the hold operation
T1
T3
T5
T7
T6
T4
Operating Status
HOLD
RESET
ZERO
T2
T8
Cancels
the hold operation
Starts
digital ZERO
operation
Cancels
digital ZERO
operation
OFF
ON
OFF
ON
OFF
ON
Starts
the hold operation
Starts
the hold operation
T1
T3
T5
T7
T6
T4
Operating Status
HOLD
RESET
ZERO
T2
5.
OPERATION TIMING
5-1
CONTROL INPUT (HOLD, RESET, ZERO)
T1: 4ms(Max) ...................... A period of time required for starting the HOLD operation starting from the
[HOLD] signal ON.
T2: 4ms(Max) ...................... When it is in peak hold mode and arbitrary point hold mode, a period of
time required for canceling the HOLD operation starting from the [HOLD]
signal OFF.
T3: 4ms(Max) ...................... When it is in block specified hold mode and time specified hold mode, a
period of time required for canceling the HOLD operation starting from the
[RESET] signal ON.
T4: 4ms(Max) ...................... A period of time required for starting digital ZERO operation starting from
the [ZERO] signal ON.
T5: 4ms(Max) ...................... A period of time required for canceling the digital ZERO operation starting
from the [ZERO] signal OFF.
T6: 5ms(Min) ...................... Time required for the [HOLD] signal.
T7: 5ms(Min) ...................... Time required for the [RESET] signal.
T8: 5ms(Min) ...................... Time required for the [ZERO] signal.
Summary of Contents for WGA-670B
Page 3: ......
Page 56: ...51 9 2 OUTSIDE DRAWING 1 With No Option WGA 670B 0 ...
Page 57: ...52 2 With BCD Option WGA 670B 1 ...