Lockout Tagout Procedure
KVAL Operation Manual
1-11
Lockout Tagout Air Supply
6.
Turn all air valves to the OFF position and place a pad-
lock through the hole (see illustration below).
NOTE:
Place your tag on the padlock, as per the
tagout guidelines.
Start Maintenance
7.
Once the locks and tags are in place and all personnel are clear, attempt to operate
the machine to ensure equipment will not operate.
8.
Maintenance or repairs may started.
Post Maintenance Steps
9.
After maintenance is completed, the person performing the work must ensure all
tools, spare parts, test equipment, etc., are completely removed and that all guards
and safety devices are installed.
10.
Before removing the locks and tags, the person who attached them shall inspect the
equipment to ensure that the machine will not be put in an unsafe condition when
re-energized.
11.
The lock and tag can now be removed (only by the person(s) who placed them),
and the machine can be re-energized.
12.
The tags must be destroyed and the locks and keys returned to the lockout center.
Summary of Contents for DL-NCD
Page 10: ...KVAL DL NCD Operation Manual Table of Contents ...
Page 28: ...How to Download the Service Application KVAL Operation Manual 1 18 ...
Page 30: ...Safety Sign Off Sheet KVAL Operation Manual 1 20 ...
Page 62: ...About the LiteCutout Feature Detail KVAL Operation Manual 2 32 ...
Page 94: ...Appendix About Backing up the Data KVAL Operation Manual 3 32 ...
Page 118: ...Appendix Servo Motor Drive Assembly Locations KVAL Operation Manual 4 24 ...
Page 139: ...About the Electrical Panels KVAL Operation Manual 5 21 I ...
Page 142: ......
Page 143: ......