70 / 85
Issued: 08.09.2015 Version: Spez KR 30, 60-2 JET V1
Transporting the
beam
The beam (
>>>
Fig. 7-6 ) can be transported with a fork lift truck or using lift-
ing tackle and a crane. When using lifting tackle, the beam must be picked up
in accordance with the following diagram. Load stands (4 per beam) with the
appropriate carrying capacity are to be used as transport aids. The corre-
sponding M20 threaded holes for transport purposes are provided in the
beam.
If the carriage is already mounted on the beam, it must be positioned near the
center of gravity and secured so that it cannot move. If the beam is transported
using a fork lift truck, attention must paid to the position of the center of gravity.
When setting it down on the floor, the substructure must be such that no parts
can be damaged.
The handling equipment must have sufficient carrying capacity. The weight of
the components can be noted from the “Order-specific technical data”.
Fig. 7-5: Transport frame
1
Transport frame for inverted robot
2
Transport frame for side-mounted robot
3
Center of gravity
Fig. 7-6: Transporting the beam
Summary of Contents for KR 30-2
Page 6: ...6 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 8: ...8 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 12: ...12 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 62: ...62 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 66: ...66 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 72: ...72 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 74: ...74 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 82: ...82 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...
Page 85: ...85 85 Issued 08 09 2015 Version Spez KR 30 60 2 JET V1 KR 30 2 JET KR 60 2 JET...