
HYDRAULIC SYSTEM
L3540-II, L4240-II, L5040-II, L5240-II, L5740-II , WSM
8-S8
[2] HYDRAULIC PUMP (FOR THREE POINT HITCH)
(1) Pump Test Using Flow-meter
Preparation
1. Open the bonnet.
2. Remove the side skirt RH.
3. Remove the delivery pipe 1 (1).
(When reassembling)
• Install the copper washers firmly.
9Y1211167HYS0006US0
(1) Delivery Pipe 1
KiSC issued 02, 2015 A
Summary of Contents for WSM L3540-II
Page 1: ...L3540 II L4240 II L5040 II L5240 II L5740 II WORKSHOP MANUAL TRACTOR KiSC issued 02 2015 A...
Page 3: ...I INFORMATION KiSC issued 02 2015 A...
Page 21: ...G GENERAL KiSC issued 02 2015 A...
Page 97: ...1 ENGINE KiSC issued 02 2015 A...
Page 175: ...2 CLUTCH KiSC issued 02 2015 A...
Page 176: ...CONTENTS 1 FEATURE 2 M1 MECHANISM KiSC issued 02 2015 A...
Page 199: ...3 TRANSMISSION KiSC issued 02 2015 A...
Page 371: ...4 REAR AXLE KiSC issued 02 2015 A...
Page 372: ...CONTENTS 1 STRUCTURE 4 M1 MECHANISM KiSC issued 02 2015 A...
Page 382: ...5 BRAKES KiSC issued 02 2015 A...
Page 383: ...CONTENTS 1 STRUCTURE 5 M1 2 OPERATION 5 M2 MECHANISM KiSC issued 02 2015 A...
Page 398: ...6 FRONT AXLE KiSC issued 02 2015 A...
Page 399: ...CONTENTS 1 STRUCTURE 6 M1 1 4WD TYPE 6 M1 MECHANISM KiSC issued 02 2015 A...
Page 424: ...7 STEERING KiSC issued 02 2015 A...
Page 442: ...8 HYDRAULIC SYSTEM KiSC issued 02 2015 A...
Page 496: ...9 ELECTRICAL SYSTEM KiSC issued 02 2015 A...
Page 611: ...10 CABIN KiSC issued 02 2015 A...