Operation
93
!
Rocker switch auxiliary port (3) on the right control lever must
be pushed over completely to the right and left.
The auxiliary port connectors (1 and 2) are pressure relieved.
Placing out of operation
!
Drive the excavator onto level ground.
!
Extend the hydraulic cylinders as follows:
!
Stop the engine (page 70).
!
Remove the key.
!
Unbuckle the seat belt and lift the left control console.
!
Refuel the excavator, if necessary (page 103).
!
Close and lock the cab door. The key must remain with the operator.
!
Check the excavator for external damage and for leaks. Any defects must be repaired before the next start.
!
In case of a heavy accumulation of dirt in the area of the tracks and the hinges at the front attachments, clean
the excavator (page 124).
Park the excavator in such a way that it can not move and is secured against unauthorised use.
Boom:
Half-extended
Arm:
Half-extended
Bucket:
Half-extended
Dozer:
Lowered to the ground
Swing mechanism:
Front attachments lowered centrally to the ground
1
1
2
2
3
STOP