Operation
79
!
Adhering soil can be shaken off when the bucket is being emptied by moving the cylinder to the end of the
stroke. Should this not suffice, dump the arm as far as possible and operate the bucket back and forth.
!
When excavating, always lower the dozer completely onto the ground.
Note on using wider and deeper buckets
Operating the dozer
!
To lift the dozer, pull the dozer control lever (1) back.
!
To lower the dozer, push the dozer control lever forward.
(A) Dozer up.
(B) Dozer down.
When using a wider or deeper bucket, take good care
when swinging or retracting the front attachments to
make sure that the bucket does not hit the cab.
When working with the dozer, operate both drive le-
vers with the left hand and the dozer control lever with
the right hand.