
42
3
© 2017 KOSTAL Solar Electric GmbH
Installation
Inserting LAN overvoltage protection
1.
Fit the mounts provided for LAN overvoltage protec-
tion on the inverter's retaining plate (5 Nm)
Fig. 28, It. 1
.
PE
Fig. 28: LAN overvoltage protection mount
1
Overvoltage protection mount 2 x
2.
Install overvoltage protection of communication
cables for LAN. Insert the modules into the fitted
mount. Plug the communication cables into the
corresponding module and connect on to the
communication board.
PE
Fig. 29: LAN overvoltage protection
1
Installation position for overvoltage protection 2 x
H
Overvoltage protection installed
INFO
Note the manufacturer's installation
and assembly instructions for the
overvoltage protection.
The following types are approved for
the overvoltage protection and can
be ordered from the KOSTAL online
shop:
Ethernet connection (LAN):
2 x CLD RJ45B (10324083)
2
3
4
6
7
8
9
10
11
1
5