
140
11
© 2017 KOSTAL Solar Electric GmbH
Appendix
11.3 Handover to the operator
Following successful installation and commissioning, all
documents are to be handed over to the operator. The
operator must be made aware of the following points:
n
Position and function of the DC switch
n
Position and function of the AC line circuit breaker
n
Safety when handling the device
n
Appropriate procedure when checking and servicing
the unit
n
Meaning of the LEDs and the display messages
n
Contact person in the event of a fault
2
3
4
6
7
8
9
10
11
1
5