OPERATION
OPERATION
3-128
5.
Assemble the shims selected in Step 4, align the pin holes,
then insert bucket hinge pin (5).
Coat with grease to prevent damage to the dust seal when
inserting the bucket hinge pin.
Use a bucket hinge pin that has a grease hole.
6.
Install mounting bolt (6).
7.
Move cord ring (2) down to the groove.
NOTICE
Coat the groove of the cord ring with grease before install-
ing it. If the cord ring is installed while the groove is dry,
force will be applied to the cord ring when the bucket is
operated and this will cause damage to the cord ring.
8.
Use the same procedure as in steps 1 to 7 to install the bucket link pin.
Assemble a pin that has no grease hole at the bucket link.
9.
Coat the bucket hinge pin and bucket link pin with grease. For details, see “LUBRICATING (4-45)“.
For details of removing and installing the bucket, please contact your Komatsu distributor.
Summary of Contents for WA800-3E0
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2...
Page 66: ...GENERAL VIEW OPERATION 3 4...
Page 84: ...EXPLANATION OF COMPONENTS OPERATION 3 22 SWITCHES 3...
Page 224: ...TROUBLESHOOTING OPERATION 3 162...
Page 309: ...SPECIFICATIONS 15...
Page 330: ...HANDLING MACHINES EQUIPPED WITH VHMS ATTACHMENTS OPTIONS 6 20...
Page 331: ...INDEX 17...
Page 332: ...INDEX 7 2...
Page 335: ...COLOPHON 18...