If Hi is displayed, press the travel speed selector switch to
change the travel speed to Lo.
6.
Set the lock lever to FREE position (F).
Be sure to operate the lock lever by the operating portion
on the top.
7.
Operate the work equipment control lever to swing the up-
per structure so that the work equipment is on the sprocket
side.
At this time, set the undercarriage and upper structure in
parallel.
8.
Before moving the machine onto the ramps, check that the
machine is positioned in a straight line with the ramps and
that the centerline of the machine matches that of the trail-
er.
9.
Pull the travel levers backward and drive the machine
slowly toward the ramps.
Lower the work equipment as far as possible without causing interference.
On the ramps, do not operate any other lever than travel lever.
10. When the machine rides on the platform of the trailer, stop
the machine and swing the upper structure slowly by 180 °.
TRANSPORTATION
OPERATION
3-222
Summary of Contents for PC45MR-30403
Page 61: ......
Page 64: ...14 Engine rear cover 15 Cooling cover 16 Battery 17 KDPF OPERATION GENERAL VIEW 3 3...
Page 411: ......
Page 412: ...SPECIFICATIONS 5 1...
Page 417: ......
Page 459: ......
Page 460: ...REPLACEMENT PARTS 7 1...