2-53
PC210/240-ENG
3.
Set the safety lock lever
c
to the FREE position, and raise the
bucket from the ground.
4.
Operate bucket control lever
v
and arm control lever
b
slowly to
move the bucket cylinder and arm cylinder to the end of the stroke.
5.
Carry out bucket and arm operation for 5 minutes at full stroke, alter-
nating between bucket operation and arm operation at 30 second
intervals.
If the swing lock switch
n
is set to the ON (actuated) position and
swing control lever
b
is operated at full stroke, oil temperature rise
can be increased earlier.
NOTICE
When the work equipment is retracted, take care that it does not
interfere with the machine body or ground.
6.
After carrying out the warming-up operation, check that each gauge
and monitor lamp is in the following condition.
•
Engine water temperature gauge
g
: Inside green range
•
Fuel gauge
h
: Inside green range
•
Engine water temperature monitor
i
: OUT
•
Radiator water level monitor
j
: OUT
•
Engine oil pressure monitor
k
: OUT
•
Charge level monitor
l
: OUT
•
Fuel level monitor
m
: OUT
•
Air cleaner clogging monitor
n
: OUT
•
Engine pre-heating monitor
o
: OUT
•
Engine oil level monitor
p
: OUT
•
Hydraulic oil level monitor
q
: OUT
7.
Check that there is no abnormal exhaust gas colour, noise, or vibra-
tion. If any abnormality is found, repair it.
12. OPERATION
Summary of Contents for PC210
Page 2: ......
Page 44: ...1 32 PC210 240 ENG MEMO ...
Page 45: ...2 1 PC210 240 ENG OPERATION ...
Page 146: ...2 102 PC210 240 ENG ...
Page 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Page 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 220: ...3 74 PC210 240 ENG ...
Page 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Page 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Page 232: ...4 12 PC210 240 ENG ...
Page 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Page 266: ...5 34 PC210 240 ENG 5 32 ...