2-84
PC210/240-ENG
13. TRANSPORTATION
2.
Set the travel speed switch to the Lo position.
3.
Turn the auto-deceleration switch OFF, and return the fuel control
dial to reduce the engine speed.
4.
Turn the swing lock switch ON to apply the swing lock.
5.
Set in the direction of the ramps, lower the work equipment as far as
possible without letting it hit the trailer, then travel slowly to load or
unload the machine.
When on the ramps, do not operate any lever other than the travel
lever.
6.
Load the machine correctly in the specified position on the trailer.
REMARK
When the work equipment is installed, load the machine from the
front; when the work equipment is not installed, load the machine from the
rear.
Summary of Contents for PC210
Page 2: ......
Page 44: ...1 32 PC210 240 ENG MEMO ...
Page 45: ...2 1 PC210 240 ENG OPERATION ...
Page 146: ...2 102 PC210 240 ENG ...
Page 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Page 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 220: ...3 74 PC210 240 ENG ...
Page 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Page 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Page 232: ...4 12 PC210 240 ENG ...
Page 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Page 266: ...5 34 PC210 240 ENG 5 32 ...