3-65
PC210/240-ENG
24.8 EVERY 2000 HOURS SERVICE
Maintenance for every 100, 250, 500 and 1000 hours should be
carried out at the same time.
24.8.1 CHANGE OIL IN FINAL DRIVE CASE
• The oil is at high temperature immediately after the machine
has been operated. Wait for the oil to cool down before carry-
ing out maintenance.
• If there is still pressure remaining inside the case, the oil or
plug may fly out.
Loosen the plug slowly to release the pressure.
Prepare the following.
•
Container to catch drained oil: Min. 4.2
l
capacity
•
Refill capacity: 4.2
l
(1.11 US gal, 0,92 UK gal)
•
Handle
1.
Set the TOP mark at the top, with the TOP mark and plug
P
perpen-
dicular to the ground surface.
2.
Set a container under plug
P
to catch the oil.
3.
Remove plug
P
and
F
with the handle and drain the oil.
REMARK
Check the O-rings in the plugs for damage. If necessary, replace with
new ones.
4.
Screw in plug
P
.
5.
Add engine oil through the hole of plug
F
.
For details of the oil to use, see 20. “USE OF FUEL, COOLANT AND
LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE”.
6.
When the oil overflows from the hole of plug
F
, install plug
F
.
Tightening torque of plugs
P
and
F
: 70 ± 10Nm (7 ± 1 kgm, 50 ± 7
Ibft).
WARNING
24. SERVICE PROCEDURE
Summary of Contents for PC210
Page 2: ......
Page 44: ...1 32 PC210 240 ENG MEMO ...
Page 45: ...2 1 PC210 240 ENG OPERATION ...
Page 146: ...2 102 PC210 240 ENG ...
Page 147: ...3 1 PC210 240 ENG MAINTENANCE ...
Page 167: ...3 21 PC210 240 ENG 22 PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS m n ...
Page 220: ...3 74 PC210 240 ENG ...
Page 221: ...4 1 PC210 240 ENG SPECIFICATIONS ...
Page 231: ...4 11 PC210 240 ENG 25 SPECIFICATIONS ...
Page 232: ...4 12 PC210 240 ENG ...
Page 233: ...5 1 PC210 240 ENG OPTIONS ATTACHMENTS ...
Page 266: ...5 34 PC210 240 ENG 5 32 ...