.
MAINTENANCE
SERVICE PROCEDURE
EVERY 15000 HOURS SERVICE
Maintenance for every 250, 500, 1000, 2000, 4000, 6000, 8000 and hours of service should be performed at the
same time.
CHECK, REPLACE STEERING A ARM MOUNTING BOLT
Check and replace the A arm mounting bolts, lock plate, and
holder.
Please consult your Komatsu distributor when checking and
replacing.
(1) A arm
(2) Front suspension
(3) Lock plate
(4) Bolt
(5) Holder
4 - 85
Summary of Contents for Galeo HD405-7R
Page 1: ......
Page 2: ... 1 1 ...
Page 12: ... 2 1 ...
Page 17: ... SAFETY SAFETY LABELS POSITION FOR ATTACHING SAFETY LABELS 2 6 ...
Page 50: ... 3 1 ...
Page 135: ... OPERATION OPERATION Z Ground contact point of tire used as base 3 86 ...
Page 152: ... OPERATION OPERATION HD325 HD405 3 103 ...
Page 153: ... OPERATION OPERATION Brake performance Downhill distance 450 m 1476 ft HD325 HD405 3 104 ...
Page 154: ... OPERATION OPERATION Brake performance Downhill distance 600 m 1968 ft HD325 HD405 3 105 ...
Page 155: ... OPERATION OPERATION Brake performance Downhill distance 900 m 2952 ft HD325 HD405 3 106 ...
Page 156: ... OPERATION OPERATION Brake performance Downhill distance 1500 m 4921 ft HD325 HD405 3 107 ...
Page 157: ... OPERATION OPERATION Brake performance Downhill distance Continuous HD325 HD405 3 108 ...
Page 192: ... 4 1 ...
Page 277: ... ...
Page 278: ... 5 1 ...
Page 280: ... 6 1 ...
Page 295: ... ATTACHMENTS OPTIONS HANDLING PAYLOAD METER II CARD TYPE LEFT FACE OF CONTROLLER 6 16 ...