TP-6928 1/14
12 Section 1 System Information and Installation
1.7.2
RDC2 with APM
The PowerSync
r
Automatic Paralleling Module (APM)
includes two OnCue
r
Plus activation codes, one for
each paralleled generator set. Each generator set must
be connected to the router or modem.
A
customer-provided hub may be used to connect the two
generator sets to the router or modem, if necessary.
See Figure 1-4. Also see Section 1.7.1.
Tablet *
RDC2
Generator Set Controller
Router *
Cable or
DSL
Modem *
* Customer-provided
[
See module installation instructions for RBUS connection information.
]
The load shed kit, if equipped, is installed inside the ATS enclosure.
UPS *
(optional)
PC/
laptop *
Kohler
r
System
Multiple PCs can
be connected.
ATS
LCM or
Load
Shed
Kit
]
PIM
TP--6796
RDC2
Generator Set Controller
APM
RBUS connections
[
Ethernet cables *
Smart phone*
OnCue Plus
Server on the
Internet
Figure 1-4
Two 14RESA or 20RESA Single-Phase Generator Sets with the PowerSync
r
Automatic Paralleling
Module (APM)
Summary of Contents for OnCue Plus DC
Page 2: ......
Page 6: ...TP 6928 1 14 6 Safety Precautions and Instructions Notes...
Page 18: ...TP 6928 1 14 18 Section 1 System Information and Installation Notes...
Page 43: ......