![Kohler OnCue Plus DC Operation Download Page 11](http://html1.mh-extra.com/html/kohler/oncue-plus-dc/oncue-plus-dc_operation_1989012011.webp)
TP-6928 1/14
11
Section 1 System Information and Installation
RDC2 or DC2
Generator Set Controller
Router *
Cable or
DSL
Modem *
* Customer-provided
[
The load shed kit, if equipped, is installed inside the ATS enclosure.
Tablet *
Ethernet cables *
UPS *
(optional)
PC/
laptop *
Kohler
r
System
Multiple PCs can
be connected.
ATS
LCM or
Load
Shed
Kit
[
PIM
G6-116
Smart phone*
OnCue Plus
Server on the
Internet
Figure 1-2
Typical Connections for RDC2/DC2 Controller
Tablet *
Smart phone*
VSC Generator Set
Controller
Router *
Cable or
DSL
Modem *
* Customer-provided
[
One optional PIM or one communications kit can be installed
Ethernet cables *
UPS *
(optional)
Kohler
r
System
Multiple PCs can
be connected.
PIM or
comm. kit
[
G6-116
Battery Bank *
PC/
laptop *
OnCue Plus
Server on the
Internet
Figure 1-3
Typical Connections for VSC Controller
Summary of Contents for OnCue Plus DC
Page 2: ......
Page 6: ...TP 6928 1 14 6 Safety Precautions and Instructions Notes...
Page 18: ...TP 6928 1 14 18 Section 1 System Information and Installation Notes...
Page 43: ......