![Kohler 11RMY Service Manual Download Page 38](http://html1.mh-extra.com/html/kohler/11rmy/11rmy_service-manual_1989770038.webp)
TP-5867 11/02
28
Section 4 Controller Troubleshooting
4.4 Cyclic Cranking
The cyclic cranking adjustment potentiometers located
in the controller allow adjustment of the cranking cycle
for improved starter motor engagement.
The basic
controller has a separate cyclic cranking circuit board.
See Figure 4-10.
The integrated controller has the
adjustment potentiometers mounted on the controller
circuit board. See Figure 4-11.
The factory sets the cranking cycle for eight seconds on
time and three seconds off time. If the cranking cycle
seems shorter than the factory setting, check the engine
starting battery before readjusting the potentiometers.
The timing decreases if the battery charge is too low.
+
--
2
1
3
4
C-284507-C
1. On potentiometer
2. Off potentiometer
3. Battery
4. Voltmeter
Figure 4-10
Cyclic Cranking Board Test Connections
GM10064-
1. Overspeed adjustment potentiometer, R17
2. Cyclic crank potentiometers
1
2
Figure 4-11
Integrated Controller Circuit Board Cyclic
Crank Potentiometer Location
4.4.1
Adjustment
The ON and OFF potentiometers allow adjustment of
the on and off cycles from 1 to 60 seconds.
See
Figure 4-10 or Figure 4-11. If the generator set engine
does not perform the cyclic crank routine during starting,
verify that the cyclic cranking is correctly adjusted.
Rotate the corresponding potentiometer clockwise (cw)
to increase the time period or counterclockwise (ccw) to
decrease it. The cyclic crank feature does not operate
when both potentiometers are in the full ccw position.
4.4.2
Testing
The cyclic cranking board in the basic controller can be
removed and tested on the bench. If the cyclic crank
circuit board is correctly adjusted but the engine does
not go through the preferred crank cycle, test the board
using the following cyclic crank board test procedure.
Test equipment needed:
D
12-volt battery or DC power supply
D
DC voltmeter
Summary of Contents for 11RMY
Page 1: ...Industrial Generator Sets Models 8 5RMY 11RMY Controllers Relay TP 5867 11 02d Service...
Page 16: ...TP 5867 11 02 6 Section 1 Specifications Notes...
Page 32: ...TP 5867 11 02 22 Section 3 Troubleshooting Notes...
Page 40: ...TP 5867 11 02 30 Section 4 Controller Troubleshooting Notes...
Page 44: ...TP 5867 11 02 34 Section 5 Generator Relay Controller Troubleshooting Notes...
Page 68: ...TP 5867 11 02 58 Section 6 Component Testing and Adjustment Notes...
Page 72: ...TP 5867 11 02 62 Section 7 Generator Reconnection Notes...
Page 80: ...TP 5867 11 02 70 Section 8 Disassembly Reassembly Notes...
Page 82: ...TP 5867 11 02 72 Section 9 Wiring Diagrams Notes...
Page 87: ...TP 5867 11 02 77 Section 9 Diagrams and Drawings Relay Controller Schematic Diagram ADV 6524...
Page 96: ......
Page 97: ......