4-9
INSTALLATION
5. HULL UNIT AND TD TANK ATTACHMENT
•
Use 4 Hexagonal bolts (M20x80) to fit the Hull unit to the TD tank.
•
Make tentative clamp and try to move the Transducer unit up and down for several
times to confirm the alignment when making the final clamping evenly.
•
The Hull unit can be operated manually.
(Refer to the page 4-11)
1 TD TANK
2 GASKET
3 HEXAGONAL BOLT (M20X80)
4 FLAT WASHER (
Φ20X40X3)
5 SPRING WASHER (
Φ20)
6 HEXAGONAL NUT (M20)
Do not apply any adhesive on the Gasket.
Otherwise it disturbs being clamped evenly.
CAUT ION
Summary of Contents for ESR-145
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ... This page intentionally left blank ...
Page 14: ...8 This page intentionally left blank ...
Page 59: ... This page intentionally left blank ...
Page 62: ...4 3 INSTALLATION DIMENSIONS HULL UNIT DISPLAY UNIT Unit mm inch ...
Page 75: ... This page intentionally left blank ...
Page 85: ......
Page 86: ......