4-6
※
INSTALLATION
HULL UNIT ASSEMBLY
1. TD SHAFT LENGTH
Calculate necessary length of TD shaft from the length of TD tank (Lt) and cut off the
space portion if the shorter length than the standard 1,240mm is required.
2. TD SHAFT ADJUSTMENT
The TD tank length, 1,180mm is used, no adjustment is necessary.
1
Cut the TD shaft to the required length,
TD tank Length (Lt)+60mm.
5mm
M4
90 °
Mark to the place of Lt + 40.
This mark is united and bound tight at
the upper end of Joint arm.
2
Smooth the cut piece and taper the edge
(1mm).
3
Bore 4 holes in TD shaft:
- every 90 degrees
- 5mm from the cut end of the shaft
- bolt circle size,
φ
3.4mm
- set a tapping screw (M4) on each hole
When the space above
the TD shaft is equal to
this, the TD shaft may be
used without being cut.
TD TANK LENGTH (Lt)+ 60mm
Summary of Contents for ESR-145
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ... This page intentionally left blank ...
Page 14: ...8 This page intentionally left blank ...
Page 59: ... This page intentionally left blank ...
Page 62: ...4 3 INSTALLATION DIMENSIONS HULL UNIT DISPLAY UNIT Unit mm inch ...
Page 75: ... This page intentionally left blank ...
Page 85: ......
Page 86: ......