5
.
Partly remove the FOAM RUBBER beginning at the top (see FIGURE 14-5).
6
.
Remove 4 SCREWS (see FIGURE 14-5).
7
.
Mount BRACKET B to the SBS using the 4 SCREWS M4 * 20.
8
.
Fix the removed FOAM RUBBER to BRACKET B.
9
.
Insert TOP PANEL into BRACKET B. Do not tighten it.
10
. Move the SBS into the wall opening until the TOP PANEL gets in contact with the
wall. Check for equal distances to the right and to the left.
REMOVE FOAM RUBBER
WALL
BRACKET B
ADD FOAM RUBBER
TOP PANEL
REMOVE SCREWS
REMOVE SCREWS
MOVE SBS
figure 14-5
II 3066-2
10/98
14-6
KODAK AG, Stuttgart
Summary of Contents for MULTILOADER 700 PLUS
Page 12: ...II 3066 2 10 98 1 8 KODAK AG Stuttgart...
Page 22: ...II 3066 2 10 98 4 2 KODAK AG Stuttgart...
Page 28: ...II 3066 2 10 98 5 6 KODAK AG Stuttgart...
Page 48: ...II 3066 2 10 98 7 16 KODAK AG Stuttgart...
Page 54: ...II 3066 2 10 98 8 6 KODAK AG Stuttgart...
Page 72: ...II 3066 2 10 98 12 8 KODAK AG Stuttgart...
Page 76: ...II 3066 2 10 98 13 4 KODAK AG Stuttgart...
Page 90: ...II 3066 2 10 98 14 14 KODAK AG Stuttgart...