7
.
Route the cable out of the ADAPTER. The SENSOR- and Motor WIRES will be
connected later to PCB A4.
8
.
Fix the CONVEYER in place with 2 MOUNTING SCREWS. Use SCREWS M4 x 10.
9
.
Take out and discard the WIRE TIES at either side of the ADAPTER EXIT ROLLERS.
They are needed during transportation only to keep the upper EXIT ROLLER in place.
10.
Set up the PROCESSOR as required and install the PROCESSOR READY KIT.
See the PROCESSOR INSTALLATION MANUAL.
NOTE
The PROCESSOR START SIGNAL from the M6B goes to CONNECTOR A4X17 of PCB A4 (SBS). Ensure
that PIN 2 of this CONNECTOR re9 Volts from the M6B. If +9 Volts are applied to PIN 1 of this
CONNECTOR, the OPTOCOUPLER U8 on PCB A4 (SBS) would not react to the
PROCESSOR START SIGNAL.
SCREWS M4 x 10
figure 3-7
II 3066-2
10/98
3-4
KODAK AG, Stuttgart
Summary of Contents for MULTILOADER 700 PLUS
Page 12: ...II 3066 2 10 98 1 8 KODAK AG Stuttgart...
Page 22: ...II 3066 2 10 98 4 2 KODAK AG Stuttgart...
Page 28: ...II 3066 2 10 98 5 6 KODAK AG Stuttgart...
Page 48: ...II 3066 2 10 98 7 16 KODAK AG Stuttgart...
Page 54: ...II 3066 2 10 98 8 6 KODAK AG Stuttgart...
Page 72: ...II 3066 2 10 98 12 8 KODAK AG Stuttgart...
Page 76: ...II 3066 2 10 98 13 4 KODAK AG Stuttgart...
Page 90: ...II 3066 2 10 98 14 14 KODAK AG Stuttgart...