Electric motors Size 63 - 225 ATEX / IECEx
Maintenance
2021-05-31
51
In case you have any questions on maintenance work and
intervals, contact the manufacturer, see service address on
page 2.
Pos : 9. 26 /KN 2006-SM /nL---------- Abschnitts ende ---------- @ 8\ mod_1141997892953_0.doc @ 75471
Pos : 9. 27 /KN 2006-Pr ojekte/Herf order Elektromot oren-Wer ke/ Wart ung/006 1.1.0 Wart ungsplan @ 54\ mod_1196342707944_1.doc @ 833101
The standard version motors are fitted with permanently lubricated
bearings.
Motors from construction type 160 and above can be fitted with
lubricating equipment. The lubricating intervals depend on many
influence factors. The values in the table below apply under normal
operating conditions.
Before lubricating, remove the plug screw on the side
opposite the grease nipple and screw it back in when finished.
NOTE!
In case of questions on lubrication, contact the
manufacturer.
See page 2 for contact details.
Lubricating the ball bearings - intervals in operating hours
Size
Quantity of
grease [g]
Speed [min
-1
]
3600
3000
1800
1500
1000
500
160
25
7000
9500
14000
17000
21000
24000
180
30
6000
8000
13500
16000
20000
23000
200
40
4000
6000
11000
13000
17000
21000
225
50
3000
5000
10000
12500
16500
20000