TOS3200
81
6
Pr
o
g
ram T
est
Sequence Program Editing Procedure
This section describes the setup procedure of test conditions using an example in which the
TC measurement (between the enclosure and earth) is performed and then the PCC mea-
surement is performed by removing the test lead from the EUT. The detailed settings of this
test are shown below.
The following procedure assumes that nothing is assigned to program number 01 at start.
Entering the Edit Screen
1
Press the AUTO key to display AUTO1/2.
2
Use the rotary knob to select program number 01.
3
Press the EDIT (SHIFT+AUTO) key to display the edit screen.
Items common to all steps
Setting
Program number
01
Program name
TEST-1
Measurement network (NTWK)
B
Current measurement mode (MODE)
RMS
Measurement range (RANGE)
AUTO
Operation for FAIL judgment (ABORT) Continue (OFF)
Steps specific to each step
Setting
Step number
00
01
Operation mode
TC measurement
PCC measurement (PCC)
Connection destination of the mea-
surement terminal (PROBE)
E
NC
P
E
–
Polarity of the EUT power line (POL)
Normal phase connection
(P
NRM)
Normal phase connection
(P
NRM
)
Single fault mode (COND)
Normal status (NORM)
Normal status (NORM)
Interval
Until the START switch is
pressed (HOLD)
1 s
Upper reference (UPPER)
0.5 mA
1 mA
Lower reference (LOWER)
35 µA
None (OFF)
Test wait time (WAIT)
None (OFF)
None (OFF)
Test time (TIMER)
1 s
1 s
SHIFT
SYSTEM
RECALL
ENTER
STORE
MANUAL
I / F
EDIT
AUTO
RMT
PREV
NEXT
1
3
2
AUTO 1 / 2
NTWK:A MODE:RMS ABORT:OFF
––
END
PRG
01:--UNTITLED--
EDIT
INS
Summary of Contents for TOS3200
Page 15: ...General Description This chapter gives an overview and describes the features...
Page 20: ...20 TOS3200 Options This page has been intentionally left blank...
Page 38: ...38 TOS3200 Panel Memory This page has been intentionally left blank...
Page 105: ...Specifications This chapter gives the specifications and external dimensions...
Page 129: ......