108
PLZ-4WH
Performing Parallel Operation
Ending parallel operation
To end parallel operation and return to independent operation, turn all the units off, and then
remove the flat cables.
To return a slave unit to independent operation, from the menu, select “2.Configuration” >
“1.Master/Slave” > “Operation” > “MASTER,” and then restart the unit.
To return a master unit that was connected to boosters to independent operation, from the
menu, select “2.Configuration” > “1.Master/Slave” > “Booster” > “-,” and then restart the unit.
CAUTION
To avoid damaging the product, observe the following precautions. Do not operate the PLZ-
4WH alone with the flat cable connected.