120
A:
With a helper place the Flange Assembly flush to Slide Wall as shown in (Fig. 63.2), then attach Flange
Assembly to the (6022) SL Brace using 4 (S7) #12 x 2” Pan Screws (with #12 Screw Bezel) (Fig. 63.1) Make sure
the flat surfaces of the Flange Assembly are flush to the slide wall as shown in (Fig. 63.2)
B:
Pre-drill 1/8” (3.2mm) pilot holes in the mounting locations on Lower SL Insert (approximate spots where circles
are on figure), making sure the pre-drilled holes are a minimum of 1” (25.4mm) deep. (Fig. 63.1)
C:
Attach the Flange Assembly flush to Lower SL Insert using 4 (S6) #12 x 1” Pan Screws (with #12 Screw Bezel)
in the pre-drilled holes as shown in (Fig. 63.1) and to both left and right sides using 5 (S6) #12 x 1” Pan Screw per
side. (Fig. 63.1)
Step 63: Attach Flange Assembly to Adventure Tower
Part 1
Fig. 63.1
Fig. 63.2
Lower SL Insert
the 4 holes need
to be pre-drilled
Lower SL Insert
Flange Assembly
Inside View
side
side
6022
6022
S6
S6
S6
x 5
x 5
Outside View
bottom flush
to SL Brace
Top flush to
the SL Brace
Hardware
w/ #12
Screw Bezel
w/ #12
Screw Bezel
S7
14 x
#12 x 1” Pan Screw
4 x
#12 x 2” Pan Screw
8 x
#12 Screw Bezel
S7
S6
FW6